2016工程师英文简历模板

进修社 人气:2.47W

英语简历也能体现求职者对于外来文化的`了解和接受程度。以下是小编整理的工程师英文简历模板,供大家参考。

2016工程师英文简历模板

工程师英文简历模板1

Resume

Name: Graduates Employment Network

Gender: Female

Date of birth: 1972-02-16

Mouth: Jiangsu

The current city: Shanghai City

Work experience: five years

The current annual salary: 5-6 million yuan

Mobile phone:

Residential address:

Self evaluation

5 years working experience in mechanical design, by CET-6. Pro-E, familiar with AutoCAD, Solidworks and Office, familiar with the process, can be engaged in the design and development and project management.

Job intention

Target industry: Machinery / equipment / instrument / heavy industry, industrial automation, automobile and spare parts, petroleum / chemical / mineral / Geology

Target position: Mechanical Engineer

Expectations: Shanghai City

Expected salary: salary welfare needs to fill, generally relatively safe negotiable

Time: how long can the arrival of new jobs

Work experience

2007/07 XXX now

Industry: Machinery / equipment / heavy industry

Department of Mechanical Design Engineer

Main responsibilities

1 by the individuals responsible for project, master project schedule, assist business personnel to understand customer needs, design fixture, fixture, equipment modification and field surveying and mapping parts, including assembly drawing, part drawing, BOM list, assist purchasing staff.

2 by the individuals responsible for project, master project schedule.

3 customers are Shanghai GM, Shanghai Volkswagen, Shanghai Natiefu, Wuxi BOSCH, Wuhu United States, Kunshan and Hangzhou etc. universal Fuji.

2003/06 2007/06: Shanghai Keepahead ultrasonic equipment Co., Ltd.

Industry: Machinery / equipment / heavy industry

Department of Mechanical Design Engineer

Main responsibilities:

1 responsible for the project, including equipment assembly and parts production drawings, outsourcing list, pipeline map, assist the purchasing staff to support business personnel, at the same time tracking solution occurs processing manufacturing and assembly debugging problems, and through customer acceptance, and write instructions, sometimes also translated the equipment specifications (export in the English translation).

2 the design of automatic ultrasonic cleaning equipment automatic mechanical arm, through the tunnel drying equipment, automatic high pressure spray, ultrasonic cleaning, wind drying (with the netbelt) and other non-standard equipment.

1998/10 2002/12: Suzhou hongly mould machinery Co. ltd.;

Industry: Machinery / equipment / heavy industry

Technical department technician

Main responsibilities:

The preparation process, and according to the 2D drawings of Singapore engineer design, using Cimtron three-dimensional modeling, and translation of faxes and E-mail. Our products are stainless steel mould of glass.

Project experience

2008/06 2008/07: body machining fixture

Development tools: Pro-e, AutoCAD

Project Description: the fixture fixture for machining workpiece machining center, to the workpiece through the lateral expansion clamping device and the fixing plate, cutting through the spring pin to locate the center hole, take through the length of axis elliptical groove turntable mechanism to realize workpiece.

Responsibility description: responsible for the design of parts and assembly plans, production schedule, follow up the progress, solve the problems in the process of production and assembly.

2007/12 2008/01: a hole position check out

Development tools: Pro-e, AutoCAD

Project Description: the detector used for detecting the position degree of casting hole, products will be placed on the bottom position through a pin to detect the position of the workpiece, the detection position of the other inclined hole made reference plate and pin assembly of the handheld, seized by CMM, if not in the tolerance range of customer requirements in (+ 0.03), need to adjust.

Responsibility description: Design of parts and assembly plans, production schedule, track progress, solve problems, adjust the fixture to meet customer requirements in the tolerance range.

2006/04 - 2006/06: automatic high-pressure spray, ultrasonic cleaning, wind drying equipment production line

Development tools: AutoCAD

Project Description: this production line is used for cleaning and drying of stamping aluminum, steel mesh belt through the motor drive transmission of the workpiece, the first workpiece feeding section, the first and the two or three position is medium pressure spray, fourth, five or six position is the high-pressure spray, through high pressure pump and high pressure spray system, air knife with seventh air compressor station the water cut is eighth station, tunnel oven, final workpiece material.

Responsibilities: assist business personnel to understand customer needs, design and manufacture of the assembly and parts diagram, communication and electrical engineers, support the procurement staff, tracking the progress of solving the production problem, initial customer acceptance records of customer comments, until final acceptance by the customer.

Education and training

1994/09 1998/06: of Wuhan University of science and technology of metallurgical mechanical design and manufacturing automation degree

Certificate

1998/06 master's degree certificate

1996/09 passed the university English six levels

Language ability: English: good

 

工程师英文简历模板2

Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.

BACKGROUND SUMMARY

Over eleven years of extensive computer/electronics ed in both digital and analog electronics withspecific emphasis on computer hardware/ial expertise in system and component ork supervisor responsible for installing/maintaining Arcnet LAN icient in assembly and C programming lent communication skills including written,verbal and interpersonal.

PROFESSIONAL WORK EXPERIENCE

Stevenson Data Systems,Los Angeles,CA 1981-1993

Components Evaluation Engineer 1992-1993

Responsible for the characterization and evaluation of, and approved vendors list for:Power supplies,oscillators,crystals,and programmable logic used in desktop and laptop uated and recommended quality components that increased product ted adn developed power supply test plan used for evqluating third party power racted with vendors to resolve problems associated with components nical advisor for oted to engineer II.

Design Evaluation Engineer 1990-1992

Evaluated new computer product designs ,solving environmental problems on prototype ucted systems analysis on new computer profucts to ensure hardware,software and mechanical design gned hardware and software for PC,ISA bus programmable load board used for environmental ormed reliability lift testing on computer alled/maintained 20 ll,Arcnet LAN ined system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry yzed complete power and load of computer system and subsystem to verify power and load estimations.

Assistant Engineer 1981-1990

Performed extensive hardware evaluation ion prototype computers,tested prototype units for timing violation using the latest state-of-the-art test equipment,digital oscilloscopes and logic ormed emvironmental,ESD and acoustic gned and built a power-up test used to test prototype computers during cold boot.

EDUCATION

Bachelor of Science in Electrical Engineering

--University of Southern California 1990

Associate in Engineering Electronics

--University of Southern California 1981

Job descriptions emphasize candidate's accomploshments.

Work history is stated in reverse chronological order,with most recent employment listed first.